Doyon Technical Services was awarded a $427K contract for the design and construction of a replacement roof and the removal, replacement, and upgrades of the PAC Unit HVAC system. Doyon will initially provide a certified HVAC Technical Service Report containing recommendations for an upgraded system. Doyon will then perform all required construction and technical services for the removal and replacement of the two existing units. This work includes all alterations and additions, plus air ducting, piping, electrical system changes, wiring, thermostats, and interfaces with the system. Doyon will also be responsible for all operator training of the client’s onsite team.
The roof replacement will include removing, disposing, and replacing the existing roof and all associated flashings and gutters. This will be followed by the installation of a 30-year roof with placement of HVAC units, piping, gutters, etc.